190 South First Street
Wytheville, VA 24382
Phone: 276-223-3370
JointIDA@Wytheville.org
|
Progress Park
Learn more about our new rail-served SuperSite
Lot 24
project.
Key attributes of Progress
Park
are (click here for additional
infrastructure information):
- Quick access to I-77 and I-81 via a frontage road
at the southern entrance and Peppers Ferry Road at the northern entrance
- Class I rail-served
- 90-MW electrical substation in park
- Natural gas substation on site
- New water plant on New River
- High-capacity fiber optic service provided by
Embarq and
Citizens
- Large (166-acre pad on
232-acre lot) rail-served Lot
24 site under construction
- Lots 1, 2, 3, and 8 are
graded. Lots 2 and 3 can be combined to accommodate
a 245,000 sq ft building
- 100,000 sq ft
virtual building for Lot
8
- International Trade Area
planned
- "Mini-Park" area for smaller
industries
-
Virginia Enterprise Zone providing state and
local incentives
- Utility providers are
Wythe County (wastewater),
Town of Wytheville (water),
Atmos Energy (natural gas),
Appalachian Power (electricity), and
Embarq and Citizens (telecommunications)
-
Protective covenants
The following map shows the park boundaries, existing industries, and
possible lot layouts. The park is not subdivided, except for previously sold
lots, so remaining lot boundaries can be adjusted to meet prospect needs.
Please contact the Joint IDA for
assistance in determining appropriate lots for your project.
Progress Park Interactive Map Mouse over the lots below for detailed information.
Progress Park is owned by Wythe County. Phase I Environmental Assessment, archaeology, and soil boring
report are available upon request. Protective covenants are in place to ensure proper land use consistent
with an industrial park. Click
here to download the covenants in Microsoft Word.
|